Motor Power Sizing Guide: kW and HP
kW (kilowatts) and HP (horsepower) are both units of motor output, but buyers often mix them up. The conversion is simple: 1 kW ≈ 1.34 HP, and 1 HP ≈ 0.746 kW. So 22 kW ≈ 29.5 HP, which is why industry also calls 22 kW a "30 HP class"; and 55 kW ≈ 74 HP, often called a "75 HP class".
kW ↔ HP reference table
| kW | HP | kW | HP |
|---|---|---|---|
| 0.75 | 1 | 37 | 50 |
| 1.5 | 2 | 45 | 60 |
| 2.2 | 3 | 55 | 75 |
| 4 | 5.4 | 75 | 100 |
| 5.5 | 7.4 | 90 | 120 |
| 7.5 | 10 | 110 | 147 |
| 11 | 15 | 132 | 177 |
| 22 | 29.5 | 200 | 268 |
| 30 | 40 | 250 | 335 |
| 45 | 60 | 315 | 422 |
Motors come in standard steps
Motor power is not arbitrary - it comes in standard ratings: 0.75/1.5/2.2/3/4/5.5/7.5/11/15/18.5/22/30/37/45/55/75/90/110/132/160/200/250/315/355/400/450/500/630/800/900/1000 kW. When you choose, round up to the next standard rating so you neither over-invest nor overload the motor.
Three steps to size the power
- Work out the shaft power: pump = flow × head; fan = air volume × pressure; conveyor = load × speed.
- Add a margin: transmission loss plus 10-25% for starting and duty.
- Round up to a standard rating, then match speed and voltage (380/660 V or 3/6/10 kV).
Working out shaft power by machine
| machine | shaft power approach |
|---|---|
| pump | flow × head × density / (367 × efficiency) |
| fan | air volume × pressure / efficiency |
| conveyor | material weight + friction + lift |
| winch / crane | load torque × angular speed |
A worked example
A fan moving 40,000 m³/h at 200 mmH₂O gives roughly 26 kW from the fan power formula; add 15% margin and round up, giving 30 kW at 1450 r/min to suit the fan.
Do not "guess" the power
Guessing leads to two failures: oversizing (runs inefficiently, poor power factor, wastes space) and undersizing (overloads, overheats, trips, and can burn the motor). The three-step approach avoids both.
Matching the series
| power | recommended series |
|---|---|
| 0.4-15 kW | YE3 three-phase |
| 15-315 kW (high voltage) | Y high-voltage, YKK |
| DC 10-500 kW | Z4, Z |
| efficient / variable | TYPKK PM, YPT |
Motor power FAQs
Is bigger always better? No - oversizing overloads nothing but wastes energy; undersizing burns the motor. Size to the load plus margin.
Does 22 kW equal 30 HP? About - 22 kW ≈ 29.5 HP, so industry often calls it a 30 HP class.
How do I know the machine's kW? Look at the nameplate or calculate it (flow/head for a pump, volume/pressure for a fan, load/speed for a conveyor). If unsure, send us the operating parameters.
Why you cannot just "guess" the power
Many people pick a motor power by feel. If you oversize, the motor runs at part load, which lowers efficiency, worsens the power factor and wastes space. If you undersize, it overloads, heats up and trips - and can burn out. The three-step approach (shaft power → margin → standard rating) avoids both and is the most reliable way to size a motor.
Working out shaft power by machine
The way to calculate the shaft power depends on the machine. For a pump, use flow × head. For a fan, use air volume × pressure. For a conveyor, use material weight, friction and lift. For a winch or crane, use load torque × angular speed. Each is a slightly different calculation, but all give you the real power the machine needs before the motor and its losses.
Setting the right margin
The margin is not a fixed number - it depends on the duty. A pump usually needs 10-20%. A fan often needs 15-25%. A conveyor or winch that starts under load needs more, sometimes 1.5-2× starting torque. Intermittent, frequent-start or hot environments also need more. But do not go overboard, because too large a margin lowers efficiency.
Voltage and the standard steps
Once you have the power, match the voltage: 380 V / 660 V or, for large machines, 3 / 6 / 10 kV. Then round up to a standard rating from the list. Then match the speed (2900 / 1450 / 960 r/min for 2 / 4 / 6 pole) and the mounting. These steps complete the choice.
Summary
To size a motor, work out the shaft power, add a sensible margin and round up to a standard rating. Do not guess - oversizing and undersizing both cost money. Match the voltage, speed and mounting, and choose an efficient series for continuous duty. Send us the machine and load and we will advise.
Efficiency and power factor
Do not choose a motor on price alone. An efficient motor (IE3 class) uses less energy, which matters when it runs for thousands of hours. The power factor also matters for the installation, since a better power factor draws less reactive current and keeps the supply healthier. For continuous duty, an efficient motor repays its slightly higher price through lower running cost.
Getting an exact quote
To size and quote accurately, send us the machine type, load parameters (flow/head, air volume/pressure, torque/speed), the voltage and the duty. We will work out the shaft power, add a sensible margin, round up to a standard rating, and recommend the right series - from YE3 to Y high-voltage and Z4 DC. That avoids both oversizing and undersizing.
Getting the power right the first time saves you both the wasted energy of an oversized motor and the downtime of an undersized one.
We cover motors from a small YE3 unit up to large high-voltage machines and DC motors, so we can match the power and series to any load.